Tigard skatepark
This Tigard Times article on the skatepark from July had some background on the park. Also check out some of the old info including a plan drawing at the Tigard City website skatepark page.
A story has been circulating about how the changes to the original design came about. The Tigard City government folks have been pleased with the professionalism of the Dreamland crew and the progress of the skatepark. When Dreamland said they could save a couple of the big trees on the site by altering the design, they were pretty much given the go ahead to make what changes they saw fit.
This is how it has been done in the smaller towns and has been a great boon to skaters. Design/Build just makes sense. Those guys get on site and discover lines as they build. If they can improve flow by altering the design, they should.
as long as a ledge doesn’t get chaged to a bowl, cool.